Lamb provided Master Planning, Site Selection, Estimating, Detail Design, and Construction Administration Services for these new facilities totaling 58,000 SF

KEY FEATURES

  • Each Control Room designed for twelve (12) total console positions and three (3) separate Video Walls
  • Connected T&D support staff offices with shared overview space and amenities for operators
  • Entire second floor is a secure NERC-CIP area
  • New Computer Center with 100 rack positions
  • Adjacent offices for IT staff